Dampak Terjadi Risiko Terhadap Waktu Pada Proyek Infrastruktur Jalan di Provinsi Aceh

Rifat Aditya Hawari, Cut Sitti Rafidatul Hildayani, Risma Mauliana

Abstract


Road infrastructure development projects are dynamic and inherently inherently risky, both small and large-scale. Each project faces different risks and can impact its implementation. Therefore, risk assessment is essential to identify potential risks and mitigate potential negative impacts. The purpose of this study was to analyze the impact of risk on time (risk severity) in the implementation of road infrastructure projects in Aceh Province in 2021. The method used was a time-risk impact analysis method, with primary research sources obtained from questionnaire responses and secondary data obtained from literature studies. The respondents were from contractor companies, including: Directors (directors/deputy directors), Project Managers/Field Managers, and Engineers. Instrument validity and reliability tests were conducted in previous studies, while data processing was performed using descriptive statistical analysis and Severity Index (SI) analysis. The results of this study are expected to determine the impact of risk on time and the dominant variables in the implementation of road infrastructure development projects in Aceh Province.

References


D. Pamilangan, S. Maryam H, and I. Syafei, “Identifikasi dan Upaya Mitigasi Faktor yang Berpengaruh dalam Proyek Peningkatan Jalan di Provinsi Sulawesi Selatan,” J. Flyover, vol. 1, no. 2, pp. 8–16, Dec. 2021, doi: 10.52103/jfo.v1i2.746.

H. Darmawi, Manajemen Risiko. Jakarta: Bumi Aksara, 2016.

A. Setiawan, E. Walujodjati, and I. Farida, “Analisis Manajemen Risiko pada Proyek Pembangunan Jalan Tol Cisumdawu (Studi Kasus: Development of Cileumyi-Sumedang Dawuan Toll Road Phase I),” J. Konstr., vol. 12, no. 1, Apr. 2016, doi: 10.33364/konstruksi/v.12-1.282.

F. A. Tanjung, M. Afifuddin, and M. Isya, “Analisis Ketersediaan Fasilitas Umum Terhadap Kepuasan Penghuni Komplek Perumahan Beutari Permai Desa Bayu Kecamatan Darul Imarah Kab. Aceh Besar,” J. Arsip Rekayasa Sipil dan Perenc., vol. 1, no. 2, pp. 69–79, Aug. 2018, doi: 10.24815/jarsp.v1i2.10945.

M. R. Khadafi, M. Muttaqin, and A. Rauzana, “Identifikasi Faktor Kinerja Kontraktor yang Paling Berpengaruh Terhadap Kepuasan Stakeholders di Dinas Cipta Karya Aceh,” J. Arsip Rekayasa Sipil dan Perenc., vol. 2, no. 3, pp. 268–275, Sep. 2019, doi: 10.24815/jarsp.v2i3.13464.

S. Husin, “Risiko Pelaksanaan Proyek Konstruksi Pada Tiga Fase dalam Rentang Tahun 2000-2015 di Provinsi Aceh,” Universitas Syiah Kuala, 2019.

M. Clayton, Risk Happens!: Managing Risk and Avoiding Failure in Business Projects. Marshall Cavendish Business, 2011.

M. Nazir, Metode Penelitian. Bogor: Ghalia Indonesia, 2005.

A. Al‐Hammad, S. Al‐Mubaiyadh, and T. Mahmoud, “Public versus private sector’s assessment of problems facing the building maintenance industry in Saudi Arabia: A two‐phase study on the problems facing the maintenance industry in Saudi Arabia including a literature search and questionnaire providing a u,” Build. Res. Inf., vol. 24, no. 4, pp. 245–254, 1996.

R. Majid. A.M.Z., & McCaffer, “Assessment of Work Performance of Maintenance Contractors in Saudi Arabia,” J. Manahement Eng., vol. 13, no. October, p. No.91, 1997.

Z. Zamzami, A. Abdullah, and H. A. Rani, “Faktor-Faktor yang Mempengaruhi Konsumen dalam Memilih Perumahan (Studi Kasus: Perumahan Villa Citra dan Villa Buana Gardenia),” J. Arsip Rekayasa Sipil dan Perenc., vol. 1, no. 1, pp. 161–168, Apr. 2018, doi: 10.24815/jarsp.v1i1.10367.




DOI: https://doi.org/10.35308/jts-utu.v11i2.13737

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Rifat Aditya Hawari, Cut Sitti Rafidatul Hildayani, Risma Mauliana

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.