SISTEM PENGAKUTAN SAMPAH DI KOTA MEULABOH ANALISIS ANGGARAN BIAYA UPAH KERJA BERDASARKAN UKURAN PRODUKTIVITAS PEKERJA PADA PEKERJAAN PASANGAN DINDING BATU BATA

Zakia Zakia

Abstract


One important factor in construction projects is wages , which is required for the measurement of labor productivity which will assist the contractor in project planning improvements to get the budget costs . Productivity can be used as a parameter in determining the duration of the activity , the amount of labor and cost . The main issues to analyze or measure the value of productivity / hour / person every type of work in determining wages .Objective analysis of the cost of construction , NFPA 2007 is calculated back to the ISO 2008. Based on research on building projects Tarbiyah Islamic Madrasah ( MTI ) is obtained for the installation of brick work piece rate according to ISO 2007 is not better when compared to ISO 2008 with unit price details work SNI 2007 amounted to Rp . 9,997 , - / org / m2 and according to ISO 2008 was Rp . 14,247 , - / Org / m2 , if it 's a brick wall stucco work on the calculation of unit wage according to ISO 2007 (Rp . 8,415 , - / org / m2 ) was no better as well when compared to ISO 2008 was Rp . 11,950 , - / Org / m2. In the ceramic work according to ISO 2007 Rp.24.788 , - / org / m2 no better also than ISO 2008 Rp . 52,615 , - / Org / m2 . In a painting according to ISO 2007 Rp . 2,560 , - / Org / m2 . not better as well when compared to ISO 2008 Rp . 3,520 , - / Org / m2.

 

Keywords : labor productivity , wall , brick , wages.


Full Text:

PDF

References


Anonim, 2015, Peta Kabupaten Aceh Barat Daya dan Peta Kecamatan Blangpidie, Google.

Anonim, 2013, RAB dan Gambar Bestek Pembangunan Gedung Madrasah Tarbiyah Islam (MTI), Konsultant Perencana CV. Gamma Consultant, Blangpidie, Aceh Barat Daya.

Anonim, 2008, Standar Nasional Indonesia, Badan Standardisasi Nasional, Bandung.

Daryanto, D.S., 2001, Pengetahuan Teknik Bangunan, Rineka Cipta, Jakarta.

Fajri, 2014, Analisis Ukuran Produktivitas Pekerja Terhadap Biaya Upah Pekerjaan Dinding Batu Bata Pada Pembangunan Gedung Ruang Rawat Inap Bedah RSUD Cut Nyak Dhien Meulaboh, Tugas Akhir, Fakultas Teknik Universitas Teuku Umar, Alue Peunyareng, Meulaboh.

Huntington, W. C., dan Mickadeit, R. E., 1975, Building Construction (Materials and Types of Construction), 4 th edition, John Wiley and Sons, New York, U.S.A.

Irwansyah, D., 2008, Analisis Produktivitas Tenaga Kerja Untuk Pekerjaan Plesteran Dinding Batu Bata Pada Proyek Pembangunan Gedung MIN Seutui Banda Aceh, Tugas Akhir, Program Ekstensi Fakultas Teknik Universitas Syiah Kuala Darussalam – Banda Aceh.

Ibrahim, 2007, Rencana dan Estimate Real of Cost, Penerbit Bumi Aksara, Jakarta.

Kartasapoetra, G., 1988, Hukum Perburuhan di Indonesia Berdasarkan Pancasila, Penerbit Aksara, Jakarta.

Moekijat, 1992, Administrasi Gaji dan Upah, Cetakan Pertama, CV. Mandar Maju, Bandung.

Napitupulu, M., 1987, Industri Jasa Konstruksi Borongan, Penerbit PT. Inspiasiptek Matra, Purwokerto.

Soeharto, I., 1997, Manajemen Proyek dari Konseptual Sampai Operasional, Penerbit Erlangga, Jakarta.

Soedrajat, S. A., 1994, Analisa (Cara Modern) Anggaran Biaya Pelaksanaan, Penerbit Nova, Jakarta




DOI: https://doi.org/10.35308/jts-utu.v3i4.226

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 Jurnal Teknik Sipil