Improvement Risk Level Pada Proyek Gas Insulated Substation Sawangan Menggunakan Metode Hazard Identification Risk Assessment and Risk Control (HIRARC)

Agus Syahabuddin, Sudiman Sudiman

Abstract


The implementation of construction projects always has the potential for danger or risk that can cause considerable losses regarding costs, materials, and time. Every workplace always has the risk of work accidents that can disrupt work activities in a project. The factors that cause work accidents are the lack of understanding of good Occupational Safety and Health (K3) and also the lack of implementation of the Occupational Health and Safety Management System (SMK3) in the project. The work on the Sawangan Gas Insulated Substation project is one of the projects with a fairly high level of risk in the construction world. This study aims to identify K3 risks, assess risks, and determine their control in order to reduce the level of risk. The method used in risk assessment in this study is Hazard Identification Risk Assessment and Risk Control (HIRARC). The stages used are identifying hazards, assessing risks and determining the controls used to compile K3 goals and targets to be achieved. Based on the results of this study, the Risk Rating can be reduced from 575 Risk Rating to 401 Risk Rating. After the risk control process was carried out, there was an increase, namely: High risk decreased by 65.6% from 32 to 11, Moderate risk decreased by 9.5% from 21 to 19, and for Low risk it increased from 0 to 23. The highest risks were found in commissioning and test function work, installation brickwall and roofing for control building, and tower foundation excavation.


Keywords


Work accident; Risk; K3; SMK3; HIRARC

Full Text:

PDF

References


Y. Rifani, E. Mulyani, and P. Riyanny, “Penerapan Konstruksi Dengan Menggunakan Metode HIRARC Pada Pekerjaan Akses Jalan Masuk,” J. Mhs. Tek. Sipil Univ. Tanjungpura, vol. v, no. 3, pp. 1–12, 2018.

D. Muharani, R., “Factor Related To The Incidence Of Workplace Accidents To workers In The Production Section Of The Adolina Palm Oil Mill PTPN IVSerdang Bedagai District,” J. Glob. Heal., vol. 2, no. 3, pp. 122–130, 2019.

P. Giananta, J. Hutabarat, and Soemanto, “Analisa Potensi Bahaya Dan Perbaikan Sistem Keselamatan dan Kesehatan Kerja Menggunakan Metode HIRARC Di PT. Boma Bisma Indra,” J. Valtech (Jurnal Mhs. Tek. Ind., vol. 3, no. 2, pp. 106–110, 2020.

S. A. Muhtia, Suharni A. Fachrin, and Alfina Baharuddin, “Analisis Risiko Keselamatan dan Kesehatan Kerja dengan Metode HIRARC (Hazard Identification, Risk Assesment, Risk Control) pada Pekerja PT. Varia Usaha Beton Cabang Makassar,” Wind. Public Heal. J., vol. 1, no. 3, pp. 166–175, 2020, doi: 10.33096/woph.v1i3.94.

M. F. Pratama, E. Ismiyah, and A. W. Rizqi, “Analisis Risiko (K3) Metode Hazard Identification Risk Assesment And Risk Control (HIRARC) di Departemen Laboratorium PT. ABC,” J. Ilm. Giga, vol. 25, no. 2, p. 88, 2022, doi: 10.47313/jig.v25i2.1922.

J. D. Fairussihan and D. Setiono, “Analisis Risiko Keselamatan Dan Kesehatan Kerka (K3) Pada Proses Perbaikan Kapal Di Pt. Dock Dan Perkapalan Surabaya Menggunakan Metode Hirarc (Hazard Identification, Risk Assessment, And Risk Control),” Zo. Laut J. Inov. Sains Dan Teknol. Kelaut., pp. 23–29, 2023, doi: 10.62012/zl.v4i1.18977.

A. M. Syabana and M. Basuki, “Analisis Risiko Keselamatan dan Kesehatan Kerja (K3) Menggunakan Metode Hazard Identification, Risk Assessment and Risk Control (HIRARC) di PT. Bintang Timur Samudera,” J. Sumberd. Bumi Berkelanjutan, vol. 1, no. 1, pp. 110–114, 2022, doi: 10.31284/j.semitan.2022.3230.

F. Ramdan, K. Kunci, I. Bahaya, K. Kerja, and dan Hirarc, “Identifikasi Bahaya Dan Penilaian Risiko Pada Divisi Boiler Menggunakan Metode Hazard Identification Risk Assessment and Risk Control (Hirarc),” J. Ind. Hyg. Occup. Heal., vol. 1, no. 2, 2017, doi: 10.21111/jihoh.v1i1.752.

R. Q. Aini, “Work Accident Analysis to Increase Work Productivity Using Failure Mode and Effect Analysis (FMEA) and Fault Tree Analysis (FTA) Methods at PT . XYZ,” Budapest Int. Res. Critics Institute-Journal, vol. 5, no. 2, pp. 14680–14695, 2021, doi: 10.33258/birci.v5i2.5345.

G. Biswas, A. Bhattacharya, and R. Bhattacharya, “Occupational health status of construction workers: A review,” Int. J. Med. Sci. Public Heal., vol. 6, no. 4, pp. 669–674, 2017, doi: 10.5455/ijmsph.2017.0745302112016.

C. Achmad, S. Sugeng, S. T, S. Erwin, and N. Risa, “Penerapan Metode Hiradc Sebagai Upaya Pencegahan Risiko Kecelakaan Kerja Pada Divisi Operasi Pembangkit Listrik Tenaga Gas Uap,” J. Bisnis dan Manaj. (Journal Bus. Manag., vol. 20, no. 2, pp. 41–64, 2020, [Online]. Available: https://jurnal.uns.ac.id/jbm/article/view/54633.

I. W. G. E. Triswandana and N. K. Armaeni, “Penilaian Risiko K3 Konstruksi Dengan Metode HIRARC,” Ukarst Univ. Kadiri Ris. Tek. Sipil, vol. 4, no. 1, pp. 96–108, 2020, doi: 10.30737/ukarst.v3i2.

Sugiyono, Metode Penelitian Kuantitatif, Kualitatif dan R&D, Pertama. Jakarta: ALFABETA, 2017.

N. Martono, Metode penelitian kuantitatif: Analisis Isi dan Analisis Data Sekunder, Ed Revisi. Jakarta: Raja Grafindo Persada, 2014.

A. Widyakusuma and A. M. Zainoeddin, “Tinjauan Aktivitas Utama dan Penunjang Penghuni pada Perencanaan,” J. Kalibr. - Karya Lintas Ilmu Bid. Rekayasa Arsitektur, Sipil, Ind., vol. 5, no. 2, pp. 171–179, 2022, doi: 10.37721/kalibrasi.v5i2.1068 1.

M. M. Arifin and M. Agustin, “Analisis Strategi Pengembangan Usaha Menggunakan SWOT dan Business Model Canvas Pada Produk Air Minum Dalam Kemasan PT. Abutama,” J. Kalibr. - Karya Lintas Ilmu Bid. Rekayasa Arsitektur, Sipil, Ind., vol. 6, no. 1, pp. 1–12, 2023, doi: 10.37721/kalibrasi.v6i1.1072.




DOI: https://doi.org/10.35308/jopt.v10i2.10113

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Jurnal Optimalisasi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

JOPT: Jurnal Optimalisasi Indexing and Abstracting by: