Optimasi Penjadwalan Preventive Maintenance Komponen Boiler Menggunakan Genetic Algorithm dengan Strategi Grouping
Abstract
Operational reliability of Boilers in Steam Power Plants (PLTU) is often undermined by reactive and fragmented maintenance strategies that trigger frequent unplanned shutdowns and operational inefficiencies. This study aims to optimize preventive maintenance schedules for nine critical Boiler components in Units 1 and 2 of PLTU Nagan Raya using a Genetic Algorithm-based Grouping Maintenance strategy. Failure behaviour of components such as Cyclone Separators, Coal Feeders, and Fans is first modelled using Weibull and Normal distributions, selected through the Anderson–Darling goodness-of-fit test. An optimization model is then developed to determine a single global maintenance interval that maximizes operating time while satisfying a minimum system reliability constraint of 60%. Simulation of individual component scheduling yields highly non-synchronized intervals, ranging from 14 to 78 days, which would result in excessive shutdown frequency if implemented directly. Through Genetic Algorithm optimization, an optimal grouped maintenance interval of 10.42 days is obtained, driven primarily by the Primary Air Fan as the system bottleneck. Although this interval sacrifices part of the remaining life of more durable components, the grouped strategy significantly reduces the total number of shutdowns and simplifies maintenance planning. The main contribution of this study is a reliability-constrained grouped maintenance scheduling model for multi-component boiler systems in coal-fired power plants, providing a practical decision-support tool for improving unit availability.
Keywords
References
Suryadi, A., Zuhair, A., Susanto, S., Syaiful, M., Sahrin, A., & Judijanto, L. (2026). Pembangkit Tenaga Listrik: Dasar, Operasi, dan Perkembangannya. PT. Sonpedia Publishing Indonesia.
Pamungkas, I., Arhami, & Dirhamsyah, M. (2019, May). Monte Carlo simulation for predicting the reliability of a boiler in the Nagan Raya steam power plant. In IOP Conference Series: Materials Science and Engineering (Vol. 523, No. 1, p. 012071). IOP Publishing.
Pamungkas, I., Irawan, H. T., & Pandria, T. A. (2021). Implementasi preventive maintenance untuk meningkatkan keandalan pada komponen kritis boiler di pembangkit listrik tenaga uap. VOCATECH: Vocational Education and Technology Journal, 2(2), 73-79.
Do, P., Vu, H. C., Barros, A., & Bérenguer, C. (2015). Maintenance grouping for multi-component systems with availability constraints and limited maintenance teams. Reliability Engineering & System Safety, 142, 56-67.
Sheng, W., Liu, K. Y., Liu, Y., Meng, X., & Li, Y. (2014). Optimal placement and sizing of distributed generation via an improved nondominated sorting genetic algorithm II. IEEE Transactions on power Delivery, 30(2), 569-578.
Doostparast, M., Kolahan, F., & Doostparast, M. (2015). Optimisation of PM scheduling for multi-component systems–a simulated annealing approach. International Journal of Systems Science, 46(7), 1199-1207.
Ismail, M. S., Moghavvemi, M., & Mahlia, T. M. I. (2014). Genetic algorithm based optimization on modeling and design of hybrid renewable energy systems. Energy Conversion and Management, 85, 120-130.
Hameed, A., Khan, F., & Ahmed, S. (2016). A risk-based shutdown inspection and maintenance interval estimation considering human error. Process Safety and Environmental Protection, 100, 9-21.
Javanmard, H., & Koraeizadeh, A. A. W. (2016). Optimizing the preventive maintenance scheduling by genetic algorithm based on cost and reliability in National Iranian Drilling Company. Journal of Industrial Engineering International, 12(4), 509-516.
Piasson, D., Bíscaro, A. A., Leão, F. B., & Mantovani, J. R. S. (2016). A new approach for reliability-centered maintenance programs in electric power distribution systems based on a multiobjective genetic algorithm. Electric Power Systems Research, 137, 41-50.
Pamungkas, I., Irawan, H. T., Arhami, A., & Dirhamsyah, M. (2019). Usulan Waktu Perawatan Dan Perbaikan Berdasarkan Keandalan Pada Bagian Boiler Di Pembangkit Listrik Tenaga Uap. Jurnal Optimalisasi, 5(2), 82-95.
Pamungkas, I., Arhami, & Dirhamsyah, M. (2019, May). Monte Carlo simulation for predicting the reliability of a boiler in the Nagan Raya steam power plant. In IOP Conference Series: Materials Science and Engineering (Vol. 523, No. 1, p. 012071). IOP Publishing.
Fadhil, R. A., & Alkfari, B. H. A. (2026, March). Evaluating component contributions to system reliability using sensitivity and elasticity of the renewal function. In International Conference on Engineering and Technology for Future Sustainability (ICETEFS 2025) (Vol. 14140, pp. 71-79). SPIE.
Zhou, X., Ling, G., Yu, J., Zhou, T., & Wang, R. (2026). Balanced multi-objective evolution algorithm for unmanned systems project scheduling with preventive maintenance and order grouping constraints. Expert Systems with Applications, 299, 130006.
Kim, B. H., & Hur, D. (2026). Exploring the Genetic Algorithm for Coordinated Generator Maintenance Scheduling in a Competitive Electricity Market. Journal of Electrical Engineering & Technology, 1-9.
DOI: https://doi.org/10.35308/jopt.v12i1.14909
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Jurnal Optimalisasi

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
JOPT: Jurnal Optimalisasi Indexing and Abstracting by: