Perancangan Line Produksi Perusahaan Manufaktur Otomotif Melalui Implementasi 5S dalam Upaya Peningkatan Kapasitas Produksi Menggunakan Metode Eight Steps

Haryo Sutedi, Constantius Chrisnaputra, Rifdah Zahabiyah

Abstract


Automotive Manufacturing Industries is an American-based manufacturing company specializing in the production of automation instruments that support scientific research in proteomics and genomics. The company faces a production challenge in increasing the Manufacture Company line output from two to three units per month to meet the target set by Manufacturing Corp. USA. The primary issue identified is the lack of standardized work processes, particularly in the arrangement of tools and components, which leads to inefficiency and reduced productivity. This study aims to establish standardized work procedures to enhance operational efficiency and production capacity. The research adopts the Eight Steps methodology integrated with the 5S approach (Seiri, Seiton, Seiso, Seiketsu, Shitsuke). The improvement initiatives include reorganizing tools and components using toolboxes and trolleys, implementing labeling systems, and developing Standard Operating Procedures (SOPs). The results demonstrate a substantial improvement in production performance, with assembly time per unit reduced from 106 hours to 61 hours, representing a 57% reduction. Additionally, an operator satisfaction survey indicates a 94% success rate of the implemented improvements. The findings confirm that the application of the 5S method effectively enhances production capacity, achieves target performance, and resolves operational inefficiencies.

Keywords


5S; Eight Steps; Automotive Manufacturing

References


Hirano, H. (1995). 5 Pillars of the Visual Workplace: The Sourcebook for 5S Implementation. Productivity Press.

Imai, M. (2012). Gemba Kaizen: A Commonsense, Low-Cost Approach to Management. McGraw-Hill Education.

Liker, J. K. (2004). The Toyota Way: 14 Management Principles from the World’s Greatest Manufacturer. McGraw-Hill.

Ohno, T. (1988). Toyota Production System: Beyond Large-Scale Production. Productivity Press.

Gapp, R., Fisher, R., & Kobayashi, K. (2008). Implementing 5S within a Japanese Context: An Integrated Management System. Management Decision, 46(4), 565–579.

Singh, J., & Ahuja, I. P. S. (2014). Evaluating the Impact of 5S Methodology on Manufacturing Performance. Journal of Manufacturing Technology Management, 25(5), 631–647.

Kumar, S., & Kumar, S. (2018). Lean Manufacturing Implementation through 5S in SMEs. International Journal of Lean Six Sigma, 9(1), 45–65.

Juran, J. M. (1999). Juran’s Quality Handbook. McGraw-Hill.

Slack, N., Chambers, S., & Johnston, R. (2010). Operations Management (6th ed.). Pearson Education.

Gaspersz, V. (2007). Continuous Improvement: Sistem Manajemen Kinerja untuk Organisasi Bisnis dan Pemerintah. Gramedia.

Gaspersz, V. (2011). Lean Six Sigma for Manufacturing and Service Industries. Vinchristo Publication.

Sugiarto, S., & Rachman, A. (2019). Penerapan Metode 5S untuk Meningkatkan Efisiensi Kerja di Lini Produksi. Jurnal Teknik Industri, 20(2), 87–96.

Dewi, L., & Santoso, H. (2020). Analisis Penerapan 5S pada Area Assembly untuk Peningkatan Produktivitas. Jurnal Rekayasa Sistem Industri, 9(1), 33–42.

Putra, R., & Wibowo, A. (2021). Peningkatan Efisiensi Produksi melalui Implementasi 5S dan Kaizen pada Industri Otomotif. Jurnal Ilmiah Teknik Industri, 10(2), 56–64.

Supriyadi, B., & Widodo, T. (2022). Aplikasi Metode 5S dan Eight Steps dalam Perbaikan Kinerja Produksi di Industri Manufaktur. Prosiding Seminar Nasional Teknik Industri, 2(1), 112–119.




DOI: https://doi.org/10.35308/jopt.v12i1.13625

Refbacks

  • There are currently no refbacks.


Copyright (c) 2026 Jurnal Optimalisasi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

JOPT: Jurnal Optimalisasi Indexing and Abstracting by: