CV. Barona Vulkanisir Ban is a company engaged in tire remanufacturing, which is made to order. The problem that occurs in the company is that there are several divisions of unbalanced workload, in the production process at work stations. So that production is not carried out properly, there is a buildup of materials at several work stations. To solve this problem a line balancing process is carried out. The line balancing process is carried out using the Largest Candidate Rule (LCR) method, with the aim of obtaining a good trajectory balance design, to increase production efficiency and provide an overview of the different conditions of work stations before and after trajectory balancing. The results show that the method the best trajectory balance design with trajectory efficiency results of 58%, balace delay of 42%, smoothing index 156.58 minutes and work stations numbering 3. These results are certainly better than the previous conditions, where the track efficiency level is 21.74%, balance delay 78.26 % and smoothing index 463.58 minutes.


Keywords


Efficiency; Line Balancing; Largest Candidate Rule (LCR), Line Balancing

Full Text:

PDF

References


Barnes, Ralph M. 1980. Motion and Time Study: Design and Measurement of Work, 7th Edition. Newyork: Wiley.

Purnomo, Hari. 2004. Pengantar Teknik Industri. Yogyakarta: Graha Ilmu.

Sutalaksana, I. Z, John H.Tjakraatmadja, dan Ruhana Anggawisastra. 1979. Teknik Tata Cara Kerja. Bandung: Departemen Teknik Industri – ITB.

Wignjosoebroto, S. 2008. Ergonomi Studi Gerak dan Waktu, Edisi Keempat. Jakarta: Penerbit Guna Widya.

Benyamin W. Niebel and Andris Freivalds. 2003. Methods, Standards, and Work Design, 11th, McGrawHill.

Baroto, Teguh. 2012. Perencanaan dan Pengendalian Produksi. Jakarta: Ghalia Indonesia.

Gaspersz, Vincent Dr, D.Sc., CFPIM, CIQA, 1998. Production Planning And Inventory Control: Berdasarkan Pendekatan Sistem Teritegrasi MRP II dan JIT Menuju Manufacturing 21, Jakarta: Penerbit Gramedia Pustaka Utama.