Analisis Kelelahan Pekerja Over Time dan Shift pada Produksi Kerupuk Tahu dengan Metode Bourdone Wiersma

Fazrur Suman Prambahan, Boy Isma Putra

Abstract


UD Company. Dua Putra has a total of 5 employees and applies a working time system of 2 shifts per day. In the production process, the target that must be met within 1 month is 2000 packing crackers. From April 2022 to September 2022, the production output of tofu crackers experienced an average decrease of 17% or 350 packs of crackers. This is caused by changes in working hours and operator fatigue during production activities. In overcoming this problem, overtime is an option to complete the predetermined targets. The aim of this research is to measure the level of work fatigue and determine the factors causing fatigue among workers in tofu cracker production operators and provide suggestions for improvements to reduce the level of worker fatigue. The method used in this problem is the Bourdone Wirsma method, which is a simple measurement method that can determine mental work load and measure speed, accuracy and concentration as well as monotonous work in employees. From the analysis of the Bourdone Wirsma test method for speed levels, the results obtained were 80% of the weighted score results of "8.5", "8", "13", "12" in the quite good category. Accuracy calculations for tofu cracker production employees obtained results of 100% from the weighted score results of "5", "5.5" in the doubtful category. Concentration calculations get results of 100% from the weighted score results of "5.5", "5" and "4.5" in the doubtful category.


Keywords


Fatigue; Productivity; Shift work

Full Text:

PDF

References


N. Aini and I. L. Mariatun, “PKM Industri Rumah Tangga Kerupuk Tahu Nagih (Enak dan Gurih) di Kelurahan Kemayoran Kecamatan Bangkalan Kabupaten Bangkalan Provinsi Jawa Timur,” JAST J. Apl. Sains dan Teknol., vol. 3, no. 2, p. 107, 2019, doi: 10.33366/jast.v3i2.1436.

K. Mokodompit, T. Agustini, and B. Siokal, “Hubungan Pembagian Nurse Shift dan Overtime Working dengan Produktivitas Kinerja Perawat di Ruang Rawat Inap Rumah Sakit Labuang Baji Makassar,” Wind. Nurs. J., vol. 1, no. 2, pp. 105–112, 2021, doi: 10.33096/won.v1i2.196.

M. N. Affa and B. I. Putra, “Analisis Manual Material Handling Pada Pekerja Borongan Di PT. JC dengan Metode NBM dan RWL,” PROZIMA (Productivity, Optim. Manuf. Syst. Eng., vol. 1, no. 1, pp. 22–32, 2017, doi: 10.21070/prozima.v1i1.703.

H. F. T. Shelvyta Sari, Vebbi Andara, “PENGUKURAN TINGKAT KELELAHAN KERJA MENTAL DENGAN MENGGUNAKAN METODE BOURDON WIERSMA ( STUDI KASUS PT PERTAMINA PALEMBANG ),” pp. 127–135, 2012.

N. Aliffian and V. Putra, “Kelelahan Pekerja Bagian Produksi Dengan Metode Cardiovascular Load ( Cvl ),” vol. 02, no. 03, pp. 155–166, 2021.

H. Krisdiana, D. Ayuningtyas, J. Iljas, and E. Juliati, “Hubungan Beban Kerja Tenaga Kesehatan dengan Kelelahan Kerja di Puskesmas Kecamatan Sukmajaya Kota Depok Selama Pandemi Relationship Workload of Medical Workforce with Work Fatigue in Sukmajaya Sub-District Health Center Depok City at Pandemic,” J. Adm. dan Kebijak. Kesehat., vol. 2, no. 3, pp. 136–147, 2022.

A. S. Mariawati, L. Herlina, A. Fitriyani, and A. Umyati, “Pengukuran tingkat kelelahan kerja teller bank menggunakan Bourdon Wiersma test,” J. Ind. Serv., vol. 7, no. 2, p. 259, 2022, doi: 10.36055/jiss.v7i2.14432.

H. Krisdiana, D. Ayuningtyas, J. Iljas, and E. Juliati, “Hubungan Beban Kerja Tenaga Kesehatan dengan Kelelahan Kerja di Puskesmas Kecamatan Sukmajaya Kota Depok Selama Pandemi,” J. Biostat. Kependudukan, dan Inform. Kesehat., vol. 2, no. 3, p. 136, 2022, doi: 10.51181/bikfokes.v2i3.6248.

C. P. Hudoyo and A. Sismiani, “ANALISIS PENGARUH KERJA LEMBUR TERHADAP PRODUKTIVITAS PEKERJA KONSTRUKSI PADA PROYEK PEMBANGUNAN GEDUNG Citra,” J. Ilm. Multi Disiplin Indones., vol. 1, no. 9, pp. 1306–1313, 2022, [Online]. Available: https://katadata.co.id/berita/2020/01/06/baru-83-peserta-bpjs-kesehatan-per-akhir-2019-

R. M. . Dhani, K. Achmad, and A. S. Islami, “Perbedaan Kejadian Kecelakaan Kerja Berdasarkan Pengetahuan, Shift Dan Masa Kerja Pada Karyawan Bagian Anodizing Di Pt.X Kota Bekasi Tahun 2020,” Kesehat. dan Kebidanan STIKes Mitra RIA Husada, vol. X, no. 2, pp. 24–32, 2021.

U. Ibnu, S. Uis, J. T. Umar, L. Baja, K. B. Telp, and D. P. Batam, “Universitas ibnu sina (uis),” J. Jumka, vol. 1, no. 1, pp. 49–58, 2021.

E. Aryanny and B. Baitil, “Analis Beban Kerja Operator Di Bagian Produksi Dengan Metode Cardiovascular Load ( Cvl ) Dan Bourdon Wiersma,” Tekmapro J. Ind. Eng. Manag., vol. 16, no. 01, pp. 59–70, 2021.

Tarwaka, Ergonomi Industri Dasar Dasar Pengetahuan Ergonomi Dan Aplikasi Di Tempat Kerja. Surakarta-Indonesia: Harapan Press, 2015.

M. Carlos Alfredo and C. Desi Kusmindari, “Pengukuran Tingkat Kelelahan Kerja Mental Dengan Menggunakan Metode Bourdon Wiersma (Studi Kasus Pt Pertamina Palembang),” Bina Darma Conf. Eng. Sci., vol. 3, no. 1, pp. 127–135, 2021, [Online]. Available: http://conference.binadarma.ac.id/index.php/BDCE

Tarwaka, S. H. Bakri, and Lilik Sudiajeng, Ergonomi Untuk Keselamatan, Kesehatan Kerja Dan Produktivitas. 2004.




DOI: https://doi.org/10.35308/jopt.v9i2.8324

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Jurnal Optimalisasi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

JOPT: Jurnal Optimalisasi Indexing and Abstracting by: