This study aims to determine the optimal number of workers in accordance with the needs of the company and determine the standard time needed for the brick making process. The method used in this study is the stopwatch time study method in which this method is applied to work that lasts briefly and repeatedly (repetitive. Based on the results of the study shows that the optimal amount of labor that should be employed in accordance with the needs of companies in making stone brick press at each work station that is 2 workers with details of workers at the clay excavation station labor that should be employed that is amounting to 2 people, the station put clay into the press machine labor that should be employed that is amounting to 2 people, printing station power the work that should be employed is numbered 2 people, the work station compiles the printout into the wheelbarrow the manpower that should be employed is amounting to 2 people, and the work station compiles the press bricks to the place where the workforce should be employed which is the sum 2 people where the actual number of workers is only 3 people where of the three workers concurrently doing work activities, with the addition of the workforce at each station 1 workforce is expected to achieve production targets and can meet product demand every month at UD. Three Sets of Nagan Raya Regency. The standard time needed for the clay excavation station is 54.78 minutes, the standard time required for the station to enter clay into the press is 41.43 minutes, the standard time required for the brick press molding station is 43.03 minutes, the standard time needed at the work station to compile the printed material into the wheelbarrow is 55.86 minutes, while the standard time required at the work station to compile the brick press to the drying area is 50.17 minutes.

Keywords


Number of Workers; Standard Time; Time Study

Full Text:

PDF

References


Andi P. N. 2006. Penentuan Standar Waktu Kerja Dan Perbaikan Proses Persiapan Untuk Meminimasi Waktu Penyelesaian, Tugas Akhir Universitas Muhammadiyah Surakarta.

Nasution, H. 2008. Proses Pengelolaan Sumber Daya Manusia. Medan: Sumatera Utara. press.

Nurjannah, P. 2009. Penentuan Jumlah Tenaga Kerja Berdasarkan Waktu Standar dengan Metode Work Sampling di Bagian Packing. Sumatera Utara.

Purnomo Hari., 2004, “Pengantar Teknik Industri”, Graha ilmu,Yogyakarta.

Rully, T. 2015. Perencanaan Pengukuran Kerja dalam Menentukan Waktu Standar dengan Metode Time Study Guna Meningkatkan Produktivitas Kerja Pada Divisi Pompa Minyak PT Bukaka Teknik Utama Tbk. Jurnal Ilmiah Manajemen Fakultas Ekonomi Volume 1.

Simanjuntak, P. 2001. Pengantar Ekonomi Sumber Daya Manusia.Jakarta: LPFEUI.

Sirait, J.T. 2006. Memahami Aspek-aspek Pengelolaan Sumber Daya Manusia dalam. Organisasi. Gramedia Widiasarana Indonesia, Jakarta.

Subhan, 2015. Peningkatan Produktivitas Kerja dengan Menggunakan Metode Work Sampling pada Industri Batu Bata (Studi Kasus Pada UD Amin Jaya Kota Langsa). Jurnal Ilmiah JURUTERA Vol.02 No.02. Aceh.

Supranto, J. 2006 Riset Operasi, Untuk Pengambilan Keputusan.Jakarta: Universitas Indonesia.

Sutalaksana 2006. Teknik Perancangan Sistem Kerja. ITB. Bandung.

Tarwaka, 2004. Ergonomi untuk Keselamatan, Kesehatan Kerja dan Produktivitas. Surakarta: Uniba Press.

Wignjosoebroto, S. 2008. Ergonomi, Studi Gerak dan Waktu. Guna Widya. Jakarta.




DOI: https://doi.org/10.35308/jopt.v4i2.1497

Refbacks

  • There are currently no refbacks.


Copyright (c) 2020 Jurnal Optimalisasi



JOPT: Jurnal Optimalisasi Indexing and Abstracting by: