Perencanaan Ulang Tata Letak Fasilitas Produksi (Studi Kasus: UKM Pengolahan Ikan Asin Stefen Aluy-Meulaboh)

Khairul Hadi, Iskandar Hasanuddin, Husni Husni, Iing Pamungkas, Fitriadi Fitriadi, Heri Tri Irawan

Abstract


This study used a rectilinear method in redesigning the layout of the salted fish production facility to minimize the mileage of Stefen Aluy's UKM. Stefen Aluy UKM is one of the salted fish businesses that is developing in West Aceh and its products are evenly distributed in West Aceh and its surroundings. The large production area makes it easier for UKM Stefen Aluy to maximize salted fish production. However, the large production area owned by UKM Stefen Aluy can result in long distances so that it is ineffective and efficient. The risk of worker fatigue and injury can occur due to the long distance. In addition, there is a risk of raw materials falling while moving. To minimize this potential, it is necessary to evaluate the layout of the salted fish production facilities at UKM Stefen Aluy, namely by improving the layout of the facilities. The rectilinear method can be used to minimize mileage in making layout improvements. From the results of the layout mapping based on the measurement of the rectilinear distance, the initial layout has a rectilinear distance of 6.932 cm, while the layout of the design results obtained a rectilinear distance of 3.409 cm. The result of the layout redesign resulted in a distance reduction of 49.04% from the previous distance.

Keywords


Salted Fish; Facility Layout; Rectilinear; Distance

Full Text:

PDF

References


Muslim, D., & Ilmaniati, A. (2018). Usulan Perbaikan Tata Letak Fasilitas Terhadap Optimalisasi Jarak dan Ongkos Material Handling dengan Pendekatan Systematic Layout Planning (SLP) di PT Transplant Indonesia. jurnal media teknik dan sistem industri, 2(1), 45-52.

Pramono, M., & Widyadana, I. G. A. (2015). Perbaikan Tata Letak Fasilitas Departemen Sheet Metal 1 PT. MCP. Jurnal Titra, 3(2), 347-352.

Naurasari, A. P., Sumantri, Y., & Nata Kusuma, L. (2016). Analisis Usulan Perbaikan Tata Letak Fasilitas Station Converting (Studi Kasus: PT Kencana Tiara Gemilang, Malang). Jurnal Rekayasa dan Manajemen Sistem Industri, 4(7).

Indrianti, D. H., Nursanti, E., & LA, S. S. (2016). Perancangan Ulang Tata Letak Mesin-Mesin Produksi Di PT. Surya Bumi Kartika. Jurnal Teknologi dan Manajemen Industri, 2(2), 17-22.

Yuliana, L., Febrianti, E., & Herlina, L. (2017). Usulan Perbaikan Tata Letak Gudang dengan Menggunakan Metode CRAFT (Studi Kasus di Gudang K-Store, Krakatau Junction). Jurnal Teknik Industri Untirta.

Siska, M. (2017). Rancang Ulang Tata Letak CV. Sumber Vulkanisir Super Menggunakan Metode Konvensional dan CRAFT. Jurnal Sains dan Teknologi Industri, 14(2), 225-233.




DOI: https://doi.org/10.35308/jopt.v6i2.2569

Refbacks

  • There are currently no refbacks.


Copyright (c) 2020 Jurnal Optimalisasi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

JOPT: Jurnal Optimalisasi Indexing and Abstracting by: